World Class Facilities

We are very proud at Seaford College to have some truly excellent facilities across the campus. On top of outstanding boarding houses and classrooms, we have a wonderful building dedicated to Art, Design, and Technology, which is always filled with the exceptional creations of students past and present.

The Music department benefits from a recital room, specific areas for bands to practise in, and a high quality recording studio.

Students are able to train on some first class sports facilities, no matter their chosen sport. Few schools can boast their own 9-hole golf course and driving range, and our sports facilities include an all-weather hockey AstroTurf pitch, seven rugby pitches, six tennis courts, five outdoor netball courts, two indoor netball courts, five cricket pitches, an athletics track, a covered swimming pool, and a double sized indoor sports hall that allows tennis, netball, hockey, and many other sports to be played all year round.

Since Headmaster John Green joined Seaford, he has embarked upon a clear plan for continual investment in new, state of the art facilities to provide an even better environment for our students. The swimming pool has been covered so it can be used all year round, and in September 2017 we were proud to unveil a state of the art Performing Arts and Sports Hall, the Johnson Centre, complete with an indoor climbing wall, dance studio, cardio gym, strength & conditioning suite, spin room, and a performing arts centre able to accommodate more than 700 students. The changing facilities near the hockey pitch have also been redeveloped.

This is all part of a development masterplan which includes a new outdoor education centre, and a redevelopment of the Sixth Form Centre, English classrooms, and Library which opened in September 2019. These developments will offer the students at Seaford even more of a chance to discover their passions and achieve their personal bests.

These new developments will add immensely to the all-round, dynamic and inclusive education we are all so proud of at Seaford. Indeed it is an incredibly exciting time to be involved with Seaford both inside and outside of the classroom."

Headmaster John Green

Exciting Developments

Our plan for continual investment means that we’re always working on a new development project.

In September 2019 we opened a state of the art English Block & Library and a new Sixth Form Centre (The Hollington Centre) in the heart of the campus. 

English Block & Library

Sixth Form Centre - The Hollington Centre

Study areas

 

Social areas

 

Refurbishment Projects