New Facilities

Photographs of Progress over the summer of seaford’s development plans

Assembly Hall

Project commenced with internal demolition and external services to deliver brand new English Block consisting of 8 classrooms and state of the art Learning Resource Centre.

 

IMG_0714 IMG_0715 IMG_0716 IMG_0727 IMG_0729 IMG_0921 IMG_0982 IMG_0983 IMG_0987

Prep School

Design & installation of external canopy to provide new outdoor learning environment and play space for Prep School children, with grateful thanks and recognition of the kind donation received from Friends of Seaford Prep School.

file2-1 file-21 file1-18

Science Department

Installation of 3 brand new fixed fume hood cabinets and 1 mobile cabinet for expanded delivery of chemistry teaching & learning.

IMG_0988 IMG_0989 IMG_1149 IMG_1150 IMG_1151

 

 

 

 

 

 

 

 

 

 

Estate Signage

Roll out of new signage scheme across the parkland using new school corporate branding designs, commencing with new signage along key vehicle routes and street finger directional signs along pedestrian routes. Programme to continue throughout September with new signage to all buildings and departments.

IMG_0979 file1-17IMG_0981 IMG_0991 IMG_0992 IMG_0998 IMG_0999 IMG_1134 IMG_1138 IMG_1139 IMG_1141 IMG_1142 IMG_1146

Site road infrastructure

Continued programme across the estate with latest works completed to regrade and surface the roadway between Norwood Lane and the Year 9/10 Common Room, including safe pedestrian routes and vehicle speed restricting structures.

IMG_1148 IMG_1147 IMG_1144 IMG_0997 IMG_0996 IMG_0994 IMG_0993 IMG_0924 IMG_0923

 

Assembly Hall and Hollington Centre Refurbishment Plans

Exciting New State-of-the-Art Facilities at Seaford College

The ‘Old’ Assembly Hall

Reconfiguration and refurbishment to provide 6 new classrooms, 2 new seminar rooms, a brand new state of the art library, study room, office areas, external landscaping and a contemporary new glazed gallery providing superb views of Lavington Park and beyond.

Hollington Centre

Full refurbishment and reconfiguration to provide new Sixth Form Centre including new study & social areas, sports showers / changing facilities and a new Seaford Café Bar delivering an adult coffee shop environment for students and weekend hospitality.

A brand new Year 11 Common Room, dedicated Tuck Shop and Bag Drop areas.

Phase 1: Assembly Hall refurbishment and provision of new temporary Sixth Form study and
Year 11 social environments.

July – December 2018

Insertion of a new mezzanine floor in the ‘old’ Assembly Hall; replacement fenestration; landscaping; and addition of a new glazed gallery. Creation of a new library, provision of new study spaces and 2 new seminar rooms.

In lieu of creating 4 of the 6 classrooms on the ground floor from the outset, we will be creating temporary Sixth Form and Year 11 social areas. These areas will be furnished and facilitated to a high standard providing superb environments for the pupil & student social and relaxation time. The all new Library on the mezzanine floor will also be fully furnished to provide study and quiet reading spaces.

Phase 2: Temporary Sixth Form and Year 11 relocation.

December 2018

Relocation of Sixth Form and Year 11 to the new temporary arrangement, furnished and facilitated to an exceptionally high standard to provide much improved environment for the Spring term, vacating and enabling the refurbishment of the existing Hollington Centre.

Phase 3: Hollington Centre refurbishment

December 2018 to April 2019

New Sixth Form study and social open areas, replacement fenestration and creation of the new Seaford Café Bar and brand new state of the art changing facilities. New Sixth Form dedicated Study Room created within the first floor.
New enlarged Year 11 social area with dedicated Tuck Shop and office accommodation

Phase 4: Completion

April 2019

Relocation of Sixth Form and Year 11 into the all new accommodation and facilities within the Hollington Centre
Completion of final ground floor internal works to deliver 4 new classrooms in the ‘old’ Assembly Hall to final model of Seaford College’s exciting new Teaching & Learning building.

RevisedSFC&Y11PresentationBoards2018LR

New Sports Hall Extension Development Since Spring 2016

New Swimming Pool Complex Development – From Spring 2016 Through the Summer